Earned Value Analyse in der Praktischen Anwendung

Treść / Zawartość
Warianty tytułu
Earned Value Analysis in a Practical Application
Języki publikacji
DE
Abstrakty
EN
The earned value analysis method was used in a practical application to control and forecast progress in five similar engineering design assignments. Earned value analysis is a method that helps to monitor and forecast progress in engineering design projects. It provides a comprehensive set of metrics which help to assess performance and output of an engineering project. Three key figures form the basis of Earned Value Management. They are Budgeted Cost of Work Scheduled (BCWS) or Planned Value (PV), Budgeted Cost of Work Performed (BCWP) or Earned Value (EV) and Actual Cost of Work Performed (ACWP) or Actual Cost (AC). The earned value analysis can be deployed in practice without considerable effort. It provides valuable insights into the current status of a project and facilitates forecasting future progress and performance of a project. It is a tool that enables managers to identify and control problems before they become insurmountable. It allows engineering projects to be managed better, both on time and on budget.(original abstract)
Czasopismo
Rocznik
Numer
Strony
119--123
Opis fizyczny
Twórcy
Bibliografia
  • Brandon D.: Implementing Earned Value easily and effectively. Project Management Journal 19.2, 1998
  • Burghardt M.: Projektmanagement. Leitfaden für die Planung, Überwachung und Steuerung von Entwicklungsprojekten, 5. erweiterte Aufl., Erlangen und München 2000
  • Šebo J.; Šebo D.: Waste management logistics. In: SGEM 2007 : Modern management of mine producing, geology and environmental protection : 7 th international scientific conference: Albena, 11-15 June 2007. Sofia : International scientific Conference SGEM, 2007
  • Stelzer D. und Bratfisch, W.: Earned-Value-Analyse - ein Verfahren zur Fortschrittskontrolle und -prognose von ITProjekten, Ilmenauer Beiträge zur Wirtschaftsinformatik Nr. 10, Technische Universität Ilmenau, 2006
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171507547

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.