PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
Czasopismo
2015 | nr 4, CD 2 | 1381--1390
Tytuł artykułu

Applications of Unconventional Construction of the Railway Superstructure on the Railway Infrastructure of the Slovak Republic

Warianty tytułu
Zastosowanie niekonwencjonalnej nawierzchni torowej dla infrastruktury kolejowej w Republice Słowackiej
Języki publikacji
EN
Abstrakty
EN
Modernization of railway infrastructure in the Slovak Republic is still very current topic and is an ideal opportunity for the application of advanced systems and structural elements of railway track construction, such as slab track construction. The paper deals with application of slab track construction in the ongoing modernization of the railway infrastructure and potential for further use on the railway infrastructure of the Slovak Republic.(original abstract)
Modernizacja infrastruktury kolejowej w Republice Słowackiej jest nadal bardzo aktualnym zagadnieniem, a jest to też doskonała okazja do stosowania zaawansowanych systemów i elementów konstrukcyjnych torów kolejowych. Praca dotyczy zastosowania specjalnych konstrukcji w trwającej modernizacji infrastruktury kolejowej oraz możliwości dalszego wykorzystania ich w infrastrukturze kolejowej Republiki Słowackiej.(abstrakt oryginalny)
Czasopismo
Rocznik
Numer
Strony
1381--1390
Opis fizyczny
Twórcy
  • University of Žilina
  • University of Žilina
Bibliografia
  • [1]. Bednár M., Snopko J.: Bratislava railway tunnel. Inžinierske stavby, 1/2015, p. 30-33.
  • [2]. Darr E., Fiebig W.: Feste Fahrbahn. Konstruktion und Bauarten für Eisenbahn und Straßenbahn. Eurailpress Tetzlaff-Hestra GmbH&Co. KG, Hamburg 2006.
  • [3]. Hodas, S. - Šestáková, J.: Railway track modelling in 3D system. Theoretical foundation of civil engineering: XX Polish - Russian - Slovak seminar, University of Žilina, 2011, p. 355-360.
  • [4]. Ižvolt, L. - Šmalo, M.: Historical development and applications of unconventional structure of railway superstructure of the railway infrastructure of the Slovak Republic. Civil and environmental engineering. Scientific technical journal, 2/2014, p. 78-93.
  • [5]. Kraft O.: Erfahrungen der Deutschen Bahn AG mit der festen Fahrbahn. EI, 6/2012, p. 12-15.
  • [6]. Michalka J.: Tunnel Turecký vrch from now in operation. http://www.railpage.net/modules/ /news/article.php?storyid=2483 (13.07.2012).
  • [7]. Münchschwander P.: The development of slab track in Germany. RTR Special, 2006, p. 6-7.
  • [8]. Pyszko L., Solár M.: Technological procedure. Building structure No. 24-32-01 Railway superstructure and No. 24-32-02 Railway substructure. Construction part: Slab track. RHEDA 2000®. Združenie "Nové Mesto - Zlatovce" 2009.
  • [9]. Reconstruction of Bratislava tunnel No. 2, Building structure No. 109 Railway superstructure. DSRS, PRODEX, s.r.o., 2008.
  • [10]. ŽSR SR 103-8 General requirements for the design, construction, repair, maintenance and acceptance of construction repair and maintenance works on the slab track construction. GR ŽSR, Bratislava 2012.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171549345

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.