2019 | 29 | nr 2 | 21--41
Tytuł artykułu

Cost Analysis of Series Systems with Different Standby Components and Imperfect Coverage

Treść / Zawartość
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The authors calculate the steady-state availability and the cost-benefit analysis for three different systems with mixed standby (cold standby, warm standby) and imperfect coverage. The coverage factor is the same for an operative-unit failure as that for a warm standby-unit failure. The failure times of the operative unit and the warm standby unit are exponentially distributed while the repair time is arbitrarily distributed. The supplementary variable technique is applied to derive the steady-state availability for three different configurations. For each system, the steady-state availability is calculated according to two different cases for repair time distributions, such as exponential, and k-stage Erlang, where k = 2, 3. The configurations are compared as based on availability and cost/benefit at a special numerical value given to the distribution parameters. (original abstract)
Rocznik
Tom
29
Numer
Strony
21--41
Opis fizyczny
Twórcy
  • Rabigh-King AbdullAziz University, Rabigh, Saudi Arabia
  • Helwan University, Cairo, Egypt
Bibliografia
  • [1] EL-SHERBENY M.S., The optimal system for series systems with mixed standby components, J. Qual. Maint. Eng., 2010, 16 (3), 319-334.
  • [2] EL-SHERBENY M.S., Optimal system for warm standby components in the presence of standby switching failures, two types of failures and general repair time, International J. Comp. Appl., 2012, 44 (20), 0975-8887.
  • [3] GARG H., Performance analysis of reparable industrial systems using PSO and fuzzy confidence interval based methodology, ISA Trans., 2013, 52 (2), 171-183.
  • [4] GARG H., Performance and behavior analysis of repairable industrial systems using vague lambda-tau methodology, Appl. Soft. Comp., 2014, 22, 323-338.
  • [5] GARG H., RANI M., An approach for reliability analysis of industrial systems using PSO and IFS technique, ISA Trans., 2013, 52 (6), 701-710.
  • [6] GARG H., RANI M., SHARMA S.P., Predicting uncertain behavior of press unit in a paper industry using artificial bee colony and fuzzy Lambda-Tau methodology, Appl. Soft. Comp., 2013, 13 (4), 1869-1881.
  • [7] KADYAN M.S., Reliability and profit analysis of a single-unit system with preventive maintenance subject to maximum operation time, Ekspl. Niezawod., 2013, 15, 176-181.
  • [8] KADYAN M.S., NIWAS R., Cost benefit analysis of a single-unit system with warranty for repair, Appl. Math. Comput., 2013, 223, 346-353.
  • [9] KHALED M., EL-SAID S., EL-SHERBENY M.S., Comparing of reliability characteristic between two different systems, Appl. Math. Comp., 2006, 173, 1183-1199.
  • [10] KUMAR J., KADYAN M., MALIK S., Profit analysis of a 2-out-of-2 redundant system with single standby and degradation of the units after repair, Int. J. Syst. Assur. Eng. Manage., 2013, 4 (4), 424-434.
  • [11] WANG K.-H., LIU Y.-C., PEARN W.L., Cost benefit analysis of series systems with warm standby components and general repair time, Math. Meth. Oper. Res., 2005, 61, 329-343.
  • [12] WANG K.-H., KUO C.-C., Cost and probabilistic analysis of series systems with mixed standby components, Appl. Math. Model., 2000, 24, 957-967.
  • [13] WANG K.-H., DONG W.-L., KE J.-B., Comparison of reliability and the availability between four systems with warm standby components and standby switching failures, Appl. Math. Comp., 2006, 183, 1310-1322.
  • [14] LIAO G.L., Optimum policy for a production system with major repair and preventive maintenance, Appl. Math. Model, 2012, 36 (11), 5408-5417.
  • [15] RAM N., KADYAN M.S., KUMAR J., Stochastic modelling of a single-unit repairable system with preventive maintenance under warranty, Int. J. Comp. Appl., 2013, 75 (14), 36-41.
  • [16] RAM M., KUMAR A., Performability analysis of a system under 1-out-of-2, G scheme with perfect reworking, J. Braz. Soc. Mech. Sci. Eng., 2015, 37 (3), 1029-1038.
  • [17] WANG W., ZHAO F., PENG R., A preventive maintenance model with a two-level inspection policy based on a three-stage failure process, Rel. Eng. Syst. Saf., 2014, 121, 207-220.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171567689

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.