PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
2018 | 1 | 217--222
Tytuł artykułu

Example of Using Lean Manufacturing Tools in Assessing and Improving the Process of Car Arm Rest Production

Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
The paper deals with the use of Lean Manufacturing tools in improving the production process of car arm rests in a car manufacturing company in Poland. The article describes the original condition of a single production process of assembling ready pieces to produce car arm rests. The original condition was assessed and described with the use of some basic Lean indicators and value stream mapping. The aforementioned tools allowed to assess the process condition and to identify the organizational issues and their sources. It also enabled to reorganize the process and increase its efficiency. The further part of the article describes the results of improvement actions. The process assessment was held and improvements introduced in the first quarter of 2018. (original abstract)
Rocznik
Tom
1
Strony
217--222
Opis fizyczny
Twórcy
  • Silesian University of Technology, Poland
  • Automotive Company, Poland
  • Technical University in Zvolen, Slovak Republic
Bibliografia
  • Książek, D. and Ligarski, M. (2016).The role of the factory production control in the improvement of products and processes. In: A. Gębalska-Kwiecień, ed., Management Systems in Production Engineering. No.4. Gliwice: P.A. Nova S.A., pp. 68-79.
  • Łopatowska, J. and Jaroński, J. (2016). Doskonalenie przepływu materiału w linii produkcyjnej. [online] Available at: http://www.ptzp.org.pl/files/konferencje/kzz/artyk_pdf_2016/T1/t1_0632.pdf [Accessed 15 May 2018]
  • Midor, K. (2017).Use of Six Sigma in the production process - case study. In: M.J. Ligarski, ed., Systems supporting production engineering vol. 6 iss. 4. Gliwice: P.A. NOVA pp. 147-152.
  • Pałucha, K. (2012). World Class Manufacturing model in production management. Archives of Materials Science and Engineering. vol. 58(2), pp. 227-234.
  • Rother, M., Shook, J., (1998). Learning to see. Value stream mapping to create value and eliminate muda. Brookline: The Lean Enterprise Institute Inc.
  • Stecuła, K., Tutak, M. and Brodny, J., (2017). Application of chosen elements from Japanese production and maintenance management philosophies in Polish coal mines. In: 17th International Multidisciplinary Scientific GeoConference SGEM. Conference proceedings Vol. 17, Science and technologies in geology, exploration and mining. Iss. 13 - Exploration and mining. Sofia: STEF9 Technology, pp. 93-100.
  • Velacio.com 2018. Velacio Website. [online] Available at: http://www. velaction.com [Accessed 15 May. 2018].
  • Wojtaszak, M. and Biały, W. (2013). Measurement system analysis of attribute or continuous data, as a one of the first steps in Lean Six Sigma projects. In: J. Kaźmierczak, ed., Systems supporting production engineering. Gliwice: P.A. NOVA, pp. 144-162
  • Wolniak, R. and Skotnicka-Zasadzień, B. (2014).The use of value stream mapping to introduction of organizational innovation in industry; Metalurgija vol. 53 iss. 4, pp. 709-712
  • Womack, J. P., Jones, D.T., Ross, D. (1990).The machines that changed the World. New York: Rawson Associates.
  • Zasadzień, M. (2015). The effect of implementation maintenance cards in performance of machines in selected production company. Management Systems in Production Engineering No. 4 (20). pp. 225-229.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171593533

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.