PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
2020 | z. 145 | 309--319
Tytuł artykułu

Cost Optimization of an Investment Project Based on Contract Strategies

Treść / Zawartość
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Purpose: The article presents the actual problem of determining cost of construction project implementation. Within the conducted research, an analysis of existing approaches to managing project costs in the face of uncertainty was carried out, including the justification of the possibility of using the contract system for the purpose of optimizing the project, as well as identification of possibilities of cost engineering. Design/methodology/approach: A Case-study method, based on an assessment of the performance indicators of an investment project for the construction of a city boiler house and the project cost analysis using the Earned Value Technique, was used to prove the hypothesis about the effectiveness of using cost engineering. Findings: The results of evaluating the effectiveness of project implementation was substantiated, and the feasibility of applying the EPC contract for the cost optimization was proven. The projects implemented with the EPC contracts have a high potential. EPC/M contracts are widely used in other countries, but in Russia, this type of contract is just beginning to be used. Originality/value: In the result of the analysis, it was revealed that the main factors affecting the cost of the boiler house implementation construction project were the imperfection of the pricing system, the presence of unrecorded work and costs, the inadequacy of the rationing system; the violation of technology and timing of implementation. (original abstract)
Rocznik
Numer
Strony
309--319
Opis fizyczny
Twórcy
  • Saint-Petersburg Mining University
  • Saint-Petersburg Mining University
  • Saint-Petersburg Mining University
Bibliografia
  • 1. Doronin, P. (2019). New uniqueness as a problem. Expert-online magazine (19.02.2019). Available online https://expert.ru/2019/02/19/novaya-unikalnost-kak-problema/, 26.05.2019.
  • 2. Dorozhkin, V. (2003). Pricing and cost management in construction. Voronezh. Publ. them. E.A. Bolkhovitinova, 328.
  • 3. Kalinenko, E. (2018). Development of contractual relations with the use of engineering services in the implementation of oil refining projects in the Russian. Master's thesis, 197.
  • 4. Korkishko, A., and Shadkova, D. (2016). Value engineering as the basis for managing a field development project using the example of the company Gazprom Neft PJSC. Basic Research, 12-4.
  • 5. Loots, Ph., and Henchie, N. (2007). Worlds Apart: EPC and EPCM Contracts: Risk issues and allocation. Mayer Brown, Available online: http://fidic.org/resources/contracts/ epcm_loots_2007.pdf
  • 6. Malakhov, V. (2018). Cost modeling of investment and construction projects. Moscow.
  • 7. Malakhov, V.I. (2017). The actual problems of pricing in Russian EPCM-contracts. DPK-Press.
  • 8. Marinin, M., and Marinina, O. (2017). Improvement of project decisions efficiency and cost optimization at the mine engineering stage of reclamation in the context of open pit ore mining. 17th International Multidisciplinary Scientific Geo Conference SGEM 2017, vol. 17(13), 423, doi: 10.5593/sgem2017/13/S03.054.
  • 9. Marinina, O., and Nevskaya, M. (2017). Cost management of mining project life cycle. International Multidisciplinary Scientific Geo Conference Surveying Geology and Mining Ecology Management SGEM 2017, vol. 17(13), 175.
  • 10. Mattheys, K. (2015). What is cost engineering? https://core.ac.uk/download/pdf/140680.pdf, 10.06.2019.
  • 11. Ponomarenko, T., Fedoseev, S.V., Korotkiy, S.V., and Belitskaya N.A. (2016). Managing the Implementation of Strategic Projects in the Industrial Holding. Indian Journal of Science and Technology, 9(14), doi: 10.17485/ijst/2016/v9i14/91517.
  • 12. Roy, R. (2003). Cost Engineering: why, what and how? Cranfield University. Available online https://dspace.lib.cranfield.ac.uk/handle/1826/64.
  • 13. Rumyantsev, T. (2017). Named the final cost of construction of the stadium "Zenit-Arena". Federal News Agency. Available online https://riafan.ru, 21.04.2019.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171599573

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.