PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
2022 | nr 4 | 114--125
Tytuł artykułu

An Approach for Semi-Automated Data Quality Assurance within BIM Models

Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
Successful Building Information Modelling (BIM) enabled projects that require large volumes of project data to be embedded within BIM models. However, with this wealth of data, relevance and accuracy have been identified as important issues affecting the BIM performance of the project. Currently, Quality Assurance (QA) in the industry has focused on geometric data, including scrutinising physical and spatial clashes. However, as BIM practices progress in the industry, the requirements for non-geometric model data and their quality have become more necessary. This study aimed to ascertain the feasibility of using visual programming for semi-automating the BIM QA process in a practical case study on using BIM in infrastructure projects. This paper outlines a generic semi-automated QA methodology and its application in a construction project case study. The validity of this method was tested and evaluated in practice through (n=2) workshops. The methodology was implemented within an integrated engineering consultancy, employing visual programming methodology to generate QA summaries and additionally highlight model elements with data quality issues based on a defined set of parameters. Based on the evaluation findings, the proposed process was feasible and provided a pathway for low-cost and low-skill QA of BIM model data within the architecture, engineering and construction (AEC) industry. The paper's main scientific contribution is a conceptual framework for using visual programming to achieve automatic quality assurance. (original abstract)
Rocznik
Numer
Strony
114--125
Opis fizyczny
Twórcy
  • University College London, United Kingdom
autor
  • University of the West of England, United Kingdom
  • University of the West of England, United Kingdom
  • University of the West of England, United Kingdom
  • University of Brighton, United Kingdom
Bibliografia
  • Andekan. (2018). Kinship. Retrieved from http://kinship.io/
  • Autodesk. (2016). Dynamo. Retrieved from http://dynamobim.org/
  • Autodesk. (2018). Navisworks. Retrieved from https://www.autodesk.co.uk/products/navisworks/overview
  • Azhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry. Leadership and Management in Engineering, 11(3), 241-252. doi: 10.1061/(ASCE)LM.1943-5630.0000127
  • Batini, C., & Scannapieco, M. (2016). Data and Information Quality: Dimensions, Principles and Techniques. Cham: Springer International Publishing.10.1007/978-3-319-24106-7
  • BIM forum. (2017). Level of development specification guide. Retrieved from https://bimforum.org/wp-content/uploads/2017/11/LOD-Spec-2017-Guide_2017-11-06-1.pdf
  • Boton, C., Kubicki, S., & Halin, G. (2015). The Challenge of Level of Development in 4D/BIM Simulation Across AEC Project Lifecyle. A Case Study. Procedia Engineering, 123, 59-67. doi: /10.1016/j.proeng.2015.10.058
  • Cabinet Office. (2011). Government Construction Strategy. London: Crown copyright. Retrieved from https://www.gov.uk
  • Carbonari, G., Stravoravdis, S., & Gausden, C. (2018). Improving FM task efficiency through BIM: a proposal for BIM implementation. Journal of Corporate Real Estate, 20(1), 4-15. doi: 10.1108/JCRE-01-2017-0001
  • Cavka, H.B., Staub-French, S., & Poirier, E.A. (2017). Developing owner information requirements for BIM-enabled project delivery and asset management. Automation in Construction, 83, 169-183. doi: 10.1016/j.autcon.2017.08.006
  • Creswell, J.W. (2013). Qualitative Inquiry and Research Design: Choosing among Five Approaches. 3rd ed. London: Sage Publications.
  • Davies, K., McMeel, D.J., & Wilkinson, S. (2017). Making friends with Frankenstein: hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(1), 78-93. doi: 10.1108/ECAM-04-2015-0061
  • Donato, V., Lo Turco, M., & Bocconcino, M.M. (2018). BIM-QA/QC in the architectural design process. Architectural Engineering and Design Management, 14(3), 239-254. doi: 10.1080/17452007.2017.1370995
  • Doukari, O., & Motamedi, A. (2022). An Ontology to Enable Semantic BIM-Based Data Quality Assurance and Quality Control. Transforming Construction with Reality Capture Technologies. doi: 10.57922/tcrc.612
  • Doukari, O., Greenwood, D., Rogage, K., & Mohamad Kassem, M. (2022). Object-Centred Automated Compliance Checking: A Novel, Bottom-up Approach. Journal of Information Technology in Construction, 27(17), 335-362. doi: 10.36680/j.itcon.2022.017
  • Eastman, C.M. (2011). BIM handbook: a guide to building information modelling for owners, managers designers, engineers, and contractors. New Jersey: Wiley.
  • Fai, S., & Rafeiro, J. (2014). Establishing an Appropriate Level of Detail (LoD) for a Building Information Model (BIM) - West Block, Parliament Hill, Ottawa, Canada. ISPRS Annals of the Photogrammetry, 11(5), 123-130. doi: 10.5194/isprsannals-II-5-123-2014
  • Ghaffarianhoseini, A., Tookey, J., Ghaffarianhoseini, A., Naismith, N., Azhar, S., Efimova, O., & Raahemifar, K. (2015). Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges. Renewable and Sustainable Energy Reviews, 75, 1046-1053. doi: 10.1016/j.rser.2016.11.083
  • Han, K., & Golparvar-Fard, M. (2015). Appearance-based material classification for monitoring of operation-level construction progress using 4D BIM and site photologs. Automation in Construction, 53, 44-57. doi: 10.1016/j.autcon.2015.02.007
  • Häußler, M., & Borrmann, A. (2020). Model-based quality assurance in railway infrastructure planning. Automation in Construction, 109, 102971. doi: 10.1016/j.autcon.2019.102971
  • Hjelseth, E. (2010). Exchange of Relevant Information in BIM Objects Defined by the Role- and Life-Cycle Information Model. Architectural Engineering and Design Management, 6(4), 279-287. doi: 10.3763/aedm.2010.IDDS5
  • HM Government. (2013). Construction 2025: Industrial strategy for construction - government and industry in partnership. London: Crown copyright. Retrieved from https://www.gov.uk/
  • Holzer, D. (2016). The BIM manager's handbook: guidance for professionals in architecture, engineering and construction. Hoboken: John Wiley & Sons.10.1002/9781118982310
  • Howard, R., & Bjork, B. (2008) Building information modelling - Experts' views on standardisation and industry deployment. Advanced Engineering Informatics, 22(2), 271-280. doi: 10.1016/j.aei.2007.03.001
  • Kalyan, T.S., Zadeh, P.A., Staub-French, S. & Froese, T.M. (2016). Construction Quality Assessment Using 3D as-built Models Generated with Project Tango. Procedia Engineering, 145, 1416-1423. doi:10.1016/j.proeng.2016.04.178
  • Kensek, K.M. (2014). Integration of Environmental Sensors with BIM: case studies using Arduino, Dynamo, and the Revit API. Informes de la Construcción, 66, 31-39. doi: 10.3989/ic.13.151
  • Kensek, K.M., & Noble, D. (2014). Building information modeling: BIM in current and future practice. Hoboken: Wiley.10.4324/9781315797076
  • Khaja, M., Seo, J.D., & McArthur, J.J. (2016). Optimizing BIM Metadata Manipulation Using Parametric Tools. Procedia Engineering, 145, 259-266. doi: 10.1016/j.proeng.2016.04.072
  • Laakso, M., & Nyman, L. (2016). Exploring the relationship between research and BIM standardization: A systematic mapping of early studies on the IFC standard (1997-2007). Buildings, 6(7), 1-23. doi: 10.3390/buildings6010007
  • Lee, D., Chi, H., Wang, X., Wang, J., & Park, C. (2016). A linked data system framework for sharing construction defect information using ontologies and BIM environments. Automation in Construction, 68, 102-113. doi: 10.1016/j.autcon.2016.05.003
  • Lee, W., Tsai, M., Yang, C., Juang, J., & Su, J. (2016) V3DM+: BIM interactive collaboration system for facility management. Visualization in Engineering, 4(1), 1-15. doi: 10.1186/s40327-016-0035-9
  • Mahamadu, A.M., Mahdjoubi, L., Manu, P., & Aigbavboa, C. (2020). Attributes that determine the building information modelling capability maturity of quantity surveying practice. MATEC Web of Conferences, 312. doi: 10.1051/matecconf/202031202002
  • Motawa, I., & Almarshad, A. (2013). A knowledge-based BIM system for building maintenance. Automation in Construction, 29, 173-182. doi: 10.1016/j.autcon.2012.09.008
  • NBS. (2016). International BIM Report 2016. London: RIBA. Retrieved from https://www.thenbs.com/knowledge/nbs-international-bim-report-2016
  • NBS. (2017). National BIM Report 2017. London: RIBA. Retrieved from https://www.thenbs.com/knowledge/nbs-national-bim-report-2017
  • NBS. (2018). BIM object standard version 2.0. London: RIBA. Retrieved from https://www.nationalbimlibrary.com/resources/bimobjectstandard/NBS-BIM-Object-Standard-v2_0.pdf
  • Peters, B. (2018). Defining Environments: Understanding Architectural Performance through Modelling, Simulation and Visualisation. Architectural Design, 88(1), 82-91. doi: 10.1002/ad.2262
  • Preidel, C., Daum, S., & Borrmann, A. (2017). Data retrieval from building information models based on visual programming. Visualization in Engineering, 5(1), 1-14. doi: 10.1186/s40327-017-0055-0
  • RIBA. (2013). RIBA Plan of work 2013 overview. London: RIBA.
  • Saxon, R. (2016). BIM for Construction Clients: driving strategic value through digital information management. Newcastle: NBS.
  • Scaysbrook, S.J. (2016). How BIM can use big city data. Journal of Building Survey Appraisal and Valuation, 5(2), 144-156.
  • Solibri. (2018). Solibri model checker. Retrieved from https://www.solibri.com/products/solibri-model-checker/
  • Sun, C., Jiang, S., Skibniewski, M.J., Man, Q., & Shen, L. (2017). A literature review of the factors limiting the application of BIM in the construction industry. Technological and Economic Development of Economy, 23(5), 764-14. doi: 10.3846/20294913.2015.1087071
  • Teicholz, P.M. (2013). BIM for facility managers. Hoboken: Wiley. 10.1002/9781119572633
Typ dokumentu
Bibliografia
Identyfikator YADDA
bwmeta1.element.ekon-element-000171659262

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.