PL EN


Preferencje help
Widoczny [Schowaj] Abstrakt
Liczba wyników
2016 | 5 | nr 4 | 542--550
Tytuł artykułu

The Pert Method in Estimating Project Duration

Autorzy
Treść / Zawartość
Warianty tytułu
Języki publikacji
EN
Abstrakty
EN
In order to complete a project in time, companies must determine both the duration of the entire project as well as each of its individual tasks. Very often less experienced companies do not collect data affecting time limit for project completion. Then time required to perform specified activities are determined based on estimation and companies own experience. To minimize the risk error arising as a result of using incomplete historical data and simultaneously increasing the effectiveness of estimating the duration of the project, most project managers with pleasure use the PERT method (Program Evaluation and Review Technique) to estimate the duration of individual tasks of the project on the basis of three intermediate estimation values: optimistic, realistic and pessimistic. This paper will set the duration of an IT (Information Technology) project implementation tasks, determine both critical tasks as well as critical path of the project. Based on estimates deadlines events values, the probability of occurrence time limits shall be also appointed. (original abstract)
Rocznik
Tom
5
Numer
Strony
542--550
Opis fizyczny
Twórcy
autor
  • Warsaw University of Life Sciences - SGGW, Poland
Bibliografia
  • [1] He Z., Staples G., Ross M., Court I., (1996), Fourteen Japanese quality tools in software process improvement, The TQM Magazine, volume 8, Number 4, s. 40-44.
  • [2] Miszczyński M., (2007), Badania operacyjne I, (wykład 3B). Katedra Badań Operacyjnych Uniwersytetu Łódzkiego.
  • [3] Nafkha R. (2014), Analiza wybranych metod zarządzania projektem informatycznym we wsparciu procesów biznesowych i organizacyjnych firmy, IX Scientific Conference, Internet in the information socjety, Dąbrowa Górnicza.
  • [4] Nafkha R., Wiliński A., (2015), The critical path method in estimating project duration, Konferencja Naukowa Information Systems in Management SGGW.
  • [5] Project Management Institute, Global Standard, (2008), Guide to the Project Management Body of Knowledge, 4th edition.
  • [6] Schwalbe K., (2001), Managing Information Technology Projects, revised 6th edition, Course Technology, Cengage Learning.
  • [7] Skoruoka D., Kuchta D., Górski M. (2012), Zarządzanie ryzykiem w projekcie, WSOWL.
  • [8] Wysocki Robert K. (2013), Efektywne zarządzanie projektami, wydanie 6, Helion.
Typ dokumentu
Bibliografia
Identyfikatory
Identyfikator YADDA
bwmeta1.element.ekon-element-000171434696

Zgłoszenie zostało wysłane

Zgłoszenie zostało wysłane

Musisz być zalogowany aby pisać komentarze.
JavaScript jest wyłączony w Twojej przeglądarce internetowej. Włącz go, a następnie odśwież stronę, aby móc w pełni z niej korzystać.